Infrstructure

The Department worked with 60 beds, (SGE Wards A&B, 6th Floor G Block, 30 beds each)),three operating rooms and an OPD service daily from Monday to Friday. From 2008, the 10 beds were added to the departmental strength in the form of a liver transplant Unit. Since October 15, 2018, there has been a quantum increase in the infrastructure with the addition of the Center of Hepatobiliary Diseases and Transplantation (CHBDT)at SGPGIMS – a G+6 Building with 112 beds (19 ICU Beds, general beds, Isolation Beds, Private Wards, 4 additional Operating Rooms, Auditorium, 40-bedded Hepatology Department, its own Endoscopy Suits, Radiology Services, Research and Diagnostic Laboratories, Simulation Surgery lab and Dedicated OPD services – all getting commissioned in the very near future, with recruitment of sanctioned manpower.